Exactress Survey By Excellence & Endeavour
We Survey To Serve
Survey Consultants & Engineering Services

Projects

PROJECTS EXECUTED, to name a few


Overseas - in Bhutan :


  • Transmission line survey for Power Grid Corpn. of Bhutan. Route : Chukha- Chumdo – Olakha – Paro – Phuetsholing – Sanghigaon – Wasta – Gedu - Simtokha (approx. 140 km) on behalf of L & T (ECC)

Overseas - in India :


Topographical Survey


  • Mine Projection & Execution at Hatipota (Dooars) Dolomite Mines for NBDL;
  • MRPL Water Treatment Plant, Mangalore for L & T (ECC);
  • CMDA Project at Kolkata;
  • Pipeline and other details at Bakreswar Thermal Power Project for SPML;
  • Main water supply from Bakreswar & Chandrabhaga River to BTPP for SPML;
  • Mining project (Topo and grid control) at Singrouli, M.P. for S. K. Samanta;
  • Drainage system at Rajarhat New Town (Kolkata) for Gherzi Eastern Ltd.;
  • Pipe line, Road and other Infrastructures at Bellary Steel & Alloy Plant for M. N. Dastur;
  • Details Topo & Grid contour near Kona Expressway for K. N. Dadina;
  • Topographical Survey at GSML, Sameerwadi, Karnataka for Mukund Engineers Ltd.
  • Topographical Survey at TRL Plant, Belpahar, Orissa for TATA Refractories Ltd.,
  • Topographical Survey & Contouring of more than 3000 acre of Land at Monaharpur for HY-GRADE PELLETS LTD. (ESSAR STEEL TLD).
  • Topographical Survey & Contouring of more than 2000 acre of Land at Bokaro, Jharkhand for Electrosteel Castings Limited.
  • Topographical Survey at Mon, Nagaland for Tiru Coal Limited.

Precision Engineering Survey


  • Installation at Bellary Steel & Alloy Plant (entire project) for M. N. Dastur & Co. Ltd. & TTG Industries Ltd (Chennai);
  • Road & other infrastructure at New Note Press Project, Salboni, W.B. for MECON (India) Ltd.;
  • Underground pipeline layout and sewerage projection at Tumkur, Ramanagaram, Bangalore Godabari Basin Water Treatment Plant, Hubli-Dharwad, Chikmagalur, Malaballi for L& T (ECC);
  • Mechanical Engineering Survey at JVSL site, Bellary for TTG Industries Ltd.;
  • Quantity survey of coal stock at Vizag & Paradip ports for KCT (Coal Sales) Ltd.

Corridor Survey


Transmission Line : New Alignment - For D.V.C.

  • 220Kv D/c Mejia-Borjora Transmission Line Survey for DVC at Durgapur on behalf of Best & Crompton ;
  • 220Kv D/c Kalayaneswari - Mejia Transmission Line Survey for DVC at Burnpur on behalf of L&T ;
  • 220Kv D/c Ramgarh - Hazaribagh Transmission Line Survey for DVC at Burnpur on behalf of L&T (approx. 55 Kms);
  • 220Kv D/c Ranchi - Gola Transmission Line Survey for DVC at Burnpur on behalf of L&T (approx. 80 Kms);
  • 220Kv D/c Dhanbad - Giridih Transmission Line Survey for DVC at Burnpur on behalf of L&T (approx. 60 Kms).

On behalf of L&T (ECC)

  • 400Kv D/c Indore - Indira Sagar Transmission Line Survey for MPSEB (approx. 82 Kms.) ;
  • 400Kv D/c Muzaffarpur - Gorakhpur Transmission Line Survey for PGCIL (approx. 94 Kms.) ;
  • 400Kv D/c Satna - Hatta Transmission Line Survey for (approx.145 Kms.);
  • 400Kv D/c Gorakhpur (PGCIL) - Goraphpur (UPPCL) Transmission Line Survey for PGCIL (approx. 50 Kms.);
  • 400Kv D/c Muzzaffpur - Kanti Transmission Line Survey for PGCIL (approx. 24 Kms.) ;
  • 400Kv D/c Ranchi - Maithon Transmission Line Survey for PGCIL (approx. 85 Kms.) ;
  • 400Kv D/c Perambulur- Pugalur Transmission Line Survey for PGCIL (approx. 86 Kms.) ;
  • 400Kv D/c Kotmikala - Manendragarh Transmission Line Survey for PGCIL (approx. 26 Kms.) ;
  • 132Kv D/c Sipat - Sisringa Transmission Line Survey for CSEB (approx. 137 Kms.) ;
  • 400Kv D/c Moga - Bhiwadi Transmission Line Survey for PGCIL (approx. 144 Kms.) ;
  • 400Kv D/c Perambulur - Pugalur Transmission Line Survey for PGCIL (approx. 86 Kms.) ;
  • 220Kv D/c Cheeka - Durala Transmission Line Survey for HVPNL (approx.56 Kms.) ;
  • 400Kv D/c Gorakhpur - Lucknow Transmission Line Survey for PGCIL (approx. 134 Kms.) ;
  • 400Kv D/c Karcham - Wantoo Transmission Line Survey for JP & PGCIL (approx. 66 Kms.) ;
  • 400Kv D/c Bhadravati - Umarkhand - Parli Transmission Line Survey for PGCIL (approx. 380 Kms.) ;
  • 400Kv D/c Sakoli - Wardah Transmission Line Survey for PGCIL (approx. 133 Kms.) ;
  • 400Kv D/c Jaygarh - Karad Transmission Line Survey for PGCIL (approx. 70 Kms.) ;
  • 400Kv D/c Amritsar - Parvati Transmission Line Survey for PGCIL (approx. 35 Kms.);
  • 765Kv S/c Agra - Jetikalan Transmission Line Survey for PGCIL (approx. 140 Kms.) ;
  • 765Kv D/c Ranchi - Sipat Transmission Line Survey for PGCIL
  • 400Kv DS/c Korba - Bhilai Transmission Line Survey for PGCIL ;

For Tata Power

  • 400Kv D/c Vishnu Pravag - Muzzaffanagar Transmission Line Survey.

For EMCO Limited

  • Detailed Survey including Route Alignment, Profiling, Tower Spotting and Check Survey at Bikaner - Guga Transmission Line (approx 61 Kms.).

For CSEB, Raipur

  • 400 Kv DCDS Resonnaissance & Preliminary Survey from Bhaiyathan (Sarguja) - Raipur (approx 160 Kms.).

For NTPC Limited

  • 132 Kv D/c North Karanpura - Pakri Barwadih proposed Transmission Line Survey (approx 38 Kms.).

Transmission Line : OFC


On behalf of L&T (ECC)

  • 400 & 220Kv for Grid Corporation of India & Power Grid Corporation of India route Talcher-Roukela-Jamshedpur-Durgapur (approx. 900 Kms), Bihar Sarif-Kahelgaon (approx. 200 Kms), Narendrapur-Mendhasal-Chandaka-Bhubaneshwar (approx. 300 Kms), Bhopal-Itarsi-Bina-Jabalpur-Satna-Katni (approx 350 Kms), Korba-Bhilai-Raipur (approx. 250 Kms), Itarsi-Indore-Asoj (approx 500 Kms) ;
  • 132 Kv S/c for Power Grid Corporation of India route Farakka-Kahelgaon-Budhipadar-Tarkera-Rourkela (approx. 218 km) ;
  • 400 Kv S/c for Power Grid Corporation of India route Hyderabad-Nagarjuna Sagar-Gooty-Vijayawada-Khammam-Ramagundam (approx. 771 km) ;
  • 400 Kv S/c for Power Grid Corporation of India route Durgapur-Farakka-Maldah-Bongaigaon-Ramagundam-Bhadrawati-Bhilai-Koradi-Satpura-Itarsi-Vijayawada-Gajuwaka-Talcher-Rengali-Indravati-Jeypore (approx. 1922 km)
  • 400 Kv S/c for Power Grid Corporation of India route Indore-Ujjain--Kota-Anta-Agra-Ballabgarh-Hassar- Moga-Bhawana-Bhiwani-Mandola Bawana-Hissar-Bhiwani (approx. 912 km) ;
  • 132 Kv S/c for Grid Corporation of India route Rajganjpur-Sundargarh (approx. 137 km) ;
  • 132 Kv S/c for Grid Corporation of India route Narendrapur-Mendhasal-Chandakaa-Bhubaneshwar (approx. 192 km) ;
  • 400 Kv S/c for Madhya Pradesh State Electricity Board route Satna-Katni-Jabalpur-Itarsi-Bhopal-Bina-Bhilai-Korba-Raipur (approx. 691 km).

Road:


  • On NH-34 from Krishnanagar-Barasat (part) (approx. 40 Km) for Sur Technical Services ;
  • Topographical & Alignment along the State Roads for Jharkhand Govt. on behalf of D. Paul Chowdhury ; Route 1) Sangramdih-Tundi Road-Kodarmaghat-Barakarghat-Bariya More-Lodharya Road (approx.45Kms); 2) Kodarmaghat – Jamtara Rly. Stn.(approx.41Kms); 3) Karmatoli Chowk-Taiogor Hills-Chiraundi-Boiro Chowk-Kante Road-Chiratundi-Omranjhi Road (approx. 42 Kms); 4) Karamtoli Chawk-Khanke More-Oramanjhi Chawk (approx. 28 Kms)
  • Major Arterial Road at Rajarhat New Town, Kolkata for Gherzi Eastern ;
  • Infrastructure at Water Treatment Plant, Mangalore ;
  • Road Survey for Ircon International Ltd. route Katra-Billhaur Road Project.

Pipeline Layout


  • Thickened Red Mud Tailing Disposal System at NALCO, Damanjodi for NICCO
  • Raghunathpur water supply scheme (project of PHED) for SPML ;
  • Between Baruipur-Gocharan & Amtala PHED 24 PGs(S) for SPML ;
  • Pipeline alignment at West Bokaro (TISCO) ;
  • Pipeline at Bakreswar Thermal Power Project for SPML ;
  • Bolpur Rural Water Supply Project for Celler Brunnenbau (Germany) ;
  • Preliminary Survey of RCC Water Reservoir for Bhopal Pipe Line Project at Bhopal for SPML.

Corridor Survey for Reliance


  • Topo & detailed alignment survey along the roads of Kolkata, Howrah (approx. 300 Km) ;
  • Topo & detailed alignment survey along the roads of NH-2, NH-6, Mecheda-Haldia (approx.70Km), Krishnanagar-Katwa (approx.60 Km).

Corridor Survey for L&T (ECC)


  • Topo & detailed alignment survey along the roads of Dankuni-Birshasetu (approx. 210 Kms) and within Kolkata and upto Dankuni (approx. 36 Kms).

Project Survey -


On behalf of L&T (ECC)

Hyderabad Airport Project ;

Indira Ganghi International (IGI) Airport Project ;

Other Delhi Projects like Power TL & Distribution, NMDC-66kV GIS substation-PGCIL, 765 kV Trf. Pkg.-T1-Jhatikara, Moga-PGCIL, 400/220/66kV GIS at Harsvihar-DTL, T3 Trf. Pkg. BTBEC, Jhatikara, Meetut, Bhiwani, etc. ;

Vijayawada IT Park Project;

Strengthening Mumbai Metro TL System - MSETCL ;

Swithyard pkg at Rihand, Vindyanagar  STPP-NTPC ;

132kV TISCO TL-Tata Steel ;

400kV TL North Chennai-Almathy-Vallur-TNEB ;

Srinagar HEP Dam Project ;

800 kV HVDC TL - Biswanath-Chariyal-Tangla-PGCIL ;

Kodlam, Himachal Project ;

1132 kV TL-Lakshiminarayanpur-WBSETCL ;

Nashik Elevated Corridor Project ;

Electrical Works for Rajpura TPP, Punjab ;

Koteshwar, Rishikesh Project


On behalf of Hindusthan Alcox Limited

Kolkata Airport Project


Field Survey for GIS Mapping -


On behalf of Rolta India Limited

  • For BSNL, Pune city briefly – Control Points, IKONOS upgrading & verification.
  • For BSNL, Bereilly city – Control Points, IKONOS upgrading & verification.

Hydrographical Survey -


  • For  Bhusan Ltd, Raw Water Supply Scheme for Integrated Steel Plant, Jharsuguda on IB River.

ESBEE Specialisation

With the ever changing world and high paced emergence of advanced Technology and Instrumentation, exposure and effective adaptation of the Techniques and its efficient ... More

PROJECTS EXECUTED

Overseas - in Bhutan :

Transmission line survey for Power Grid Corpn. of Bhutan route Chukha- Chumdo- Olakha- Paro- Phuetsholing- Sanghigaon- Wasta- Gedu- Simtokha (approx. 140 km) on behalf of L & T (ECC)

In India : Topographical Survey for - Mine Projection & Execution at Hatipota (Dooars) Dolomite Mines for NBDL;

Association

Esbee Associates is a guided force within technical parameters by highly proficient senior level Engineers of Survey and other disciplines and Geologists with the aim to go along with the advancement and sophistication of Technology and Instrumentation.